← All notes
Signal1 September 2026 · 2 min read

Signal · September 2026

Three developments where the missing document is the news — and where waiting for it is the expensive option.

Since 13 August 2026

CRA standardisation: 17 standards in procedure, none cited yet

ETSI has opened the approval procedure for 17 European standards supporting the Cyber Resilience Act, with comment periods running to mid-September and mid-November 2026. No harmonised standard for the CRA is yet cited in the Official Journal. The CRA's main obligations apply from 11 December 2027.

Do not wait for the presumption of conformity. The expensive part of the CRA is not the conformity assessment, it is the support period: specifying a product today fixes how long you have to deliver security updates, and that commitment is not renegotiable after launch. The standards will govern the form of the evidence, not the duty itself. I would decide the support period per product family now and attach a cost to it — it is a product decision with a multi-year effect on the P&L.
Since 18 August 2026

Battery passport: the implementing act on access rules is missing, the deadline stands

The implementing act setting the access rules for the battery passport under Article 77(9) of Regulation (EU) 2023/1542 was not adopted within its deadline. The obligation to provide a battery passport from 18 February 2027 is unaffected.

The passport is not a data sheet, it is an authorisation system: it decides which role sees which data point. Fix the data model and the role concept now, without the act — the access matrix can be adjusted later, the data model cannot. Wait, and in January you will be bolting a role model under time pressure onto a system that was never designed for one.
From 9 December 2026

New product liability: software is a product, and a missing update can establish defectiveness

Directive (EU) 2024/2853 treats software as a product, and failure to supply security updates can establish that a product is defective. The German implementation exists as a draft (BT-Drs. 21/4297).

End-of-support becomes a liability decision rather than a service decision. The second half is less comfortable: in practice the burden falls on whoever keeps the documentation — if you cannot show when you knew what and what you decided, you lose the argument about the documentation, not about the technology. Decision records on updates therefore belong in the engineering file.

Questions or a different view? I read every mail. kehrein@swkconcept.com