← All notes
Signal1 October 2026 · 4 min read

Signal · October 2026

Three developments from September. All three move work out of the compliance function and into the product data model, the engineering file and the supplier contract.

Proposal expected 6 October 2026

The European Product Act would rewrite the CE framework

A leaked draft circulating since mid-September shows the Commission preparing to merge Decision 768/2008/EC, Regulation (EC) 765/2008 and the Market Surveillance Regulation (EU) 2019/1020 into a single directly applicable regulation. The approach is digital by default: every harmonised product would need a digital product passport — or a “product responsibility record” where no sectoral passport exists — registered before being placed on the market, with no exemption for made-to-order goods; digital CE marking would replace the physical mark after a transition period; fines would reach up to 6 % of worldwide annual turnover. The formal proposal is expected on 6 October 2026, and the published text may differ from the leak.

The headline number is the fine, but the operative change is the registration. Placing on the market stops being a declaration in a binder and becomes a data record that has to exist, be correct and be addressable per unit — which makes this a master-data project, not a legal one. That is why the missing exemption for made-to-order goods matters more than it reads: special machines, variants and spare parts each need their own record, and most ERP landscapes cannot produce one per serial number today. Worth noting too is the direction of travel: registration before market access and a digital identifier per product have now appeared in the Ecodesign Regulation, in the battery passport and in this draft, which makes it a safe planning assumption even while the text is still moving. What I would start on this quarter is unglamorous — decide who owns the product data model, and establish whether it can emit an identifier per unit at all. Everything else in this file depends on that answer.
Since 7 September 2026

The last standards list for the old Machinery Directive — and none yet for the new Regulation

Commission Implementing Decision (EU) 2026/2015 updated the harmonised standards cited under Machinery Directive 2006/42/EC with 69 entries, and is described as the final update under the Directive. No harmonised standard has yet been cited in the Official Journal under Machinery Regulation (EU) 2023/1230; the Commission states that a first list is in preparation and should cover the large majority of the references currently cited. The Regulation applies from 20 January 2027, when the references published under the Directive lose their effect.

Presumption of conformity is the cheapest evidence a product organisation can buy, and for the next four months there is none to buy under the new Regulation. The common reaction is to wait for the list. That is the wrong call, because the list will almost certainly arrive carrying restrictions wherever an existing standard does not cover the Regulation's new requirements — cybersecurity of control systems, substantially modified machinery, AI-driven safety functions — and those are exactly the parts where no standard was going to help you anyway. What pays now is a delta analysis per product family against Annex III, written by engineering rather than by a certifier. There is also a planning consequence that rarely reaches the roadmap: whether a machine is placed on the market before or after 20 January 2027 is a documentation decision with a price attached, and it belongs in the launch plan, not in the order book.
Live since 11 September 2026

CRA reporting is running — and the clock usually starts at a supplier

Since 11 September 2026, manufacturers of products with digital elements have had to report actively exploited vulnerabilities and severe incidents under Article 14 of the Cyber Resilience Act, and ENISA's Single Reporting Platform went operational the same day. The sequence is an early warning within 24 hours of becoming aware, a full notification within 72 hours, and a final report within 14 days of a corrective measure being available for vulnerabilities, or within one month of the 72-hour notification for severe incidents. Reports go to the manufacturer's CSIRT, which passes them to the CSIRTs of the countries where the product is distributed and to ENISA.

The duty was known a year in advance; what changed in September is that every filing now carries a timestamp — and so does every filing that should have happened earlier. The detail most programmes have not worked through is where awareness comes from: in a connected product it is usually a component or library supplier, which means your own 24 hours start inside somebody else's disclosure process. If supplier contracts do not carry a notification obligation shorter than your own deadline, the deadline is unachievable by design — and fixing that is procurement work, not security work. The second gap sits in the content of the notification, which names affected products and markets: that requires a current bill of materials and a current distribution list for devices that no longer have a team. And because routing runs through one CSIRT onwards to several, the first filing is visible to several authorities at once and sets the tone for every question that follows — an argument for writing the template now rather than at three in the morning.

Questions or a different view? I read every mail. kehrein@swkconcept.com